Narrative description of Project:
The Government of Nepal (the Government), has received financial assistance from Asian Development Bank (ADB), for financing the SASEC Highway Enhancement Project (Construction Supervision of Kakarbhitta Laukahi Section). Under the Project, about 120 Km road section of East West Highway from Kakarbhitta in Jhapa District to Laukahi in Sunsari District including Major Bridges at Ninda, Biring, Kankai, Ratuwa, Bakra and Lohendra river will be improved/upgrated from the existing two-lane configuration to dedicated four-lane configuration, with service lanes in selected areas. To implement the project, construction works are planned to be carried out under multiple civil works contracts (construction contract), follows:
Package 1: SHEP/OCB/KL/01: Upgrading of Kakarbhitta – Laukahi Section of East-West Highway (45 KM)
Package 2: SHEP/OCB/KL/02: Upgrading of Kakarbhitta – Laukahi Section of East-West Highway (40 KM)
Package 3: SHEP/OCB/KL/03: Upgrading of Kakarbhitta – Laukahi Section of East-West Highway (10.76 KM)
Package 4: SHEP/OCB/MBKL/04: Construction of Major Bridges (NInda, Biring and Kankai.)
Package 5: SHEP/OCB/MBKL/05: Construction of Major Bridges (Ratuwa, Bakra and Lohendra)
This Project aims to improve/upgrade the 95.76 km section of the East-West Highway from Kakarbhitta in Jhapa District, passing through Morang District on the way to Laukahi in Sunsari District, from the existing two-lane configuration to a dedicated four-lane configuration, including six (6) major bridges, with service lanes in selected areas.
Construction work is to be carried out under multiple concurrent civil works contracts comprising three (3) road packages and two (2) bridge packages, each with three (3) year construction periods. Social and resettlement safeguards, environmental protection, biodiversity conservation, gender equality and social inclusion, health and safety, HIV/AIDS and human trafficking awareness are integral components of the Project.
The improved road is the first in a series of planned improvements to existing national highways as proposed in the Governments Five-year Strategic Plan 2073-78 aimed at developing internal and international connectivity and sustainable cities/settlements.
Description of actual services provided in the assignment:
The main objective of the consulting services is to assist DOR with the supervision of all five concurrent civil works packages to achieve a high-quality outcome within time and budget that fully complies with the specified designs, standards, contract requirements and sound engineering practice. The training of Department of Roads (DOR) and Ministry of Physical Infrastructure and Transport (MoPIT) personnel during the Project is also an important objective of the consultancy services.
The consulting services to be provided include the following:
Location within country: Jhapa, Morang and Sunsari Districts
Start date (month/year): May 2024
Completion date (month/year): April 2033
Construction Supervision Period – 36 months
DLP Period – 12 months and
PBM Period – 60 months
Approx. value of the contract (in current NRs; US$ or Euro): Euro
US$ Component: US$ 4,222,735.25 and NPR Component: NRs. 692,375,267.15 (excluding VAT and Taxes)
Duration of assignment (months): 111 months
Construction Supervision Period – 36 months
DLP Period – 12 months and
PBM Period – 60 months
Total No. of person-months of the assignment: Total 2725 person months (International 191, National Key Person 865 person months and National NoneKey 1669 person months)
Approx. value of the services provided by your firm under the contract (in current NRs; US$ or Euro): NRs. 692,375,267.15 (excluding VAT and Taxes)
No. of professional person-months provided by the joint venture partners or the Sub Consultants: 191person-months – inputs of international expert
Name of joint venture partner or sub-Consultants, if any:
JV of M/S MG Consultants (Pvt.) Limited, Srilanka; Roughton International Ltd., UK, and YUKSEL PROJE A.S., Turkey